Construction restarted on 8/10 after almost 2 months because of a major design change. Chain link fencing is down. The tennis net posts were removed and holes refilled and asphalted. Porta potty/shed pad excavated and backfilled with aggregate. Short sidewalk and water fountain area excavated and backfilled with aggregate. The existing fence along the North side is remaining.
Pictures are standing to the South and looking North. The college is to the right.